Power Control believes in keeping the customers happy and providing them with a package of products and services at a very competent price...

Projects


Haier EGYPT

Haier Industrial Park

Civil Work
  • 200,000m Area
  • MAN POWER > 500
  • 9 months project
  • OFFICE BULDING 2000M THREE FLOORS
  • 2000M/L FENCE
  • 68,000 m work shop
  • 40,000 roads
  • 12,000 land scape
Electrical work
  • 10 MVA (4X TR.2.25MVA)
  • 6 M.V.SMITH GEARS
  • 240 L.V PANEL
  • MORE THAN 60,000 ML CABLES
  • MORE THAN 7500 ML CABLES TRAYS
  • MORE THAN 25,000 LIGHTING UNIT
  • 10 earthing systems
  • 9 LIGHTNING ARRESTER

2023/2024 B.


CSCEC FACTORY

  • 30,000m Area
  • OFFICE BULDING
  • FOUNDATION MACHINE
  • SOG-MOTOR TANK CANTEEN
  • ELECTRICAL WORK
  • PLUMPING WORK
  • HVAC

2023/2024 B.


Suez Steel Company Melt-Shop

Low Voltage Panel References

melt shop

Utilizing main Panel 4000A

Form 3B

14 M.L Distribution Panal

II 2012


Suez Steel Company

Project : Low Voltage Panel References


Port Said Star Factory

Project : Low Voltage Panel References


Media Egypt

TEDA Zone Ein El Soukhna

Media Dish Washing Factory

Area 60,000 m

6MVA (3*TR 2MVA)

150 Panal

MORE THAN 30,0000ML cable trays

MORE THAN 1750 LIGHTING UNITE

5 earthing systems

2021/2022

TEDA EGYPT

Ein Soukhna

24/7 working

Area 25000 m

three months

SUPPORTING AREA FACTORY 1 & FACTORY 2

TWO FACTORIES DEVIDED IN TO 8,WORKSHOPS

Seperate

United Sugar Co. (SAVOLA)

Ein El Soukhna

ION Excahnge Building.

2013/2024

United Sugar Co. (SAVOLA)

Ein Soukhna

Bulk Store EX Lighting.

2021/2022

AFIA International Co. (SAVOLA)

Suez

New Factory in Suez.

design + construction

PC light solution

Racks Smart lighting

2019/2020

El Ashry Steel Co

6’th of October

Power Station For the new Factory

KOLLING MILL

MCC POWER Station

SCADA & PLC 571500

12 ML MCC PANAL BACK TO BACK

2019/2020

IFCO EGYPT

Suez

1. Soap Factory

2. Saponification Factory

Ferro For Ferrets & Glaze

Suez

1. Street Lighting

2. Earthing System & Lightening Arrestors

3. CE Cooling, Blinder, CC Bagging, Incompostos I, Incompostos II & Seiving2

Union Aire

6’th of October

1. Refrigerator Factory.

2. Glass Factory.

3. A.C Factory.

3. Cooker Factory

Egyptian Resort Company (ERC)

Hurghada

Villa’s Project in Sahel Hashish

Port Said Star

Port Said

New factory

El Nesr German Co.

El Sadat

1. Lighting Project For the new factory

Evergrow

El Sadat

1. Foam Factory

Suez Fertilizers Co.

Suez

. Compressor Station

Suez Steel Co

Suez

1.Power Station for Melt shop II

2. Power Station for R.O

3. Cut & Pending Factory

Kandil Steel Co.

10’th of Ramadan

1.Lighting for KAMA Steel

2. Cooling Tower System, MDB 3200A, Cranes Panels Project, ATS 1MVA, Utilitiess