Projects

Haier EGYPT

Civil Work

  • 200,000m Area
  • MAN POWER > 500
  • 9 months project
  • OFFICE BULDING 2000M THREE FLOORS
  • 2000M/L FENCE
  • 68,000 m work shop
  • 40,000 roads
  • 12,000 land scape

Electrical work

  • 10 MVA (4X TR.2.25MVA)
  • 6 M.V.SMITH GEARS
  • 240 L.V PANEL
  • MORE THAN 60,000 ML CABLES
  • MORE THAN 7500 ML CABLES TRAYS
  • MORE THAN 25,000 LIGHTING UNIT
  • 10 earthing systems
  • 9 LIGHTNING ARRESTER

2023/2024

 

CSCEC FACTORY

  • 30,000m Area
  • OFFICE BULDING
  • FOUNDATION MACHINE
  • SOG-MOTOR TANK CANTEEN
  • ELECTRICAL WORK
  • PLUMPING WORK
  • HVAC

 

Suez Steel Company

Project : Low Voltage Panel References

Suez Steel Company Melt-Shop

Low Voltage Panel References
melt shop
Utilizing main Panel 4000A
Form 3B
14 M.L Distribution Panal

II 2012

Port Said Star Factory

Project : Low Voltage Panel References

Media Egypt

TEDA Zone Ein El Soukhna

 

Media Dish Washing Factory
Area 60,000 m
6MVA (3*TR 2MVA)
150 Panal
MORE THAN 30,0000ML cable trays
MORE THAN 1750 LIGHTING UNITE
5 earthing systems

TEDA EGYPT

Ein Soukhna

 

24/7 working
Area 25000 m
three months
SUPPORTING AREA FACTORY 1 & FACTORY 2
TWO FACTORIES DEVIDED IN TO 8,WORKSHOPS
Seperate

United Sugar Co. (SAVOLA)

Ein El Soukhna

 

ION Excahnge Building.
2013/2024

United Sugar Co. (SAVOLA)

Ein Soukhna

Bulk Store EX Lighting.

2021/2022

AFIA International Co. (SAVOLA)

Suez

 

New Factory in Suez.design + construction
PC light solution
Racks Smart lighting
2019/2020

El Ashry Steel Co

6’th of October

 

 
Power Station For the new Factory
KOLLING MILL
MCC POWER Station
SCADA & PLC 571500
12 ML MCC PANAL BACK TO BACK
2019/2020
 

IFCO EGYPT

Suez

 

1. Soap Factory

2. Saponification Factory

Ferro For Ferrets & Glaze

Suez

1. Street Lighting
2. Earthing System & Lightening Arrestors
3. CE Cooling, Blinder, CC Bagging, Incompostos I, Incompostos II & Seiving2

Unionaire

6’th of October

1. Refrigerator Factory.
2. Glass Factory.
3. A.C Factory.
3. Cooker Factory

Egyptian Resort Company (ERC)

Hurghada

 

Villa’s Project in Sahel Hashish

Port Said Star

Port Said

 

New factory

El Nesr German Co.

El Sadat

 

1. Lighting Project For the new factory

Suez Steel Co

Suez

 

1.Power Station for Melt shop II
2. Power Station for R.O
3. Cut & Pending Factory

Kandil Steel Co.

10’th of Ramadan

 

1.Lighting for KAMA Steel
2. Cooling Tower System, MDB 3200A, Cranes Panels Project, ATS 1MVA, Utilitiess

Suez Fertilizers Co

Suez

 

. Compressor Station

Evergrow

 El Sadat

 

1. Foam Factory