Back to Projects Industrial Project

Media Company

A complete industrial project delivered by Power Control, covering civil, electrical and HVAC works across a total project area of 50,000 square meters.

Civil Work Electrical Work HVAC Work Industrial Construction
Project Overview Industrial Facility
50,000 m² Total Area
9 Months Duration
350+ Manpower
6 MVA Power Capacity
Admin Building Production Workshop Electrical Infrastructure HVAC Systems
Media Company industrial project
50,000 Square Meters
Project Overview

Complete Industrial Project Execution

Power Control delivered a complete package of civil, electrical and HVAC works for Media Company’s industrial production facility.

Civil works included a three-floor administrative building, a 28,000-square-meter production workshop and complete structural and finishing works.

Electrical works included transformers, distribution panels, substations, energy rooms, cable trays, electrical cables and indoor and outdoor lighting.

HVAC works included split and concealed air conditioning systems, in addition to galvanized ducting installation.

Integrated Execution
trays, electrical cables and indoor and outdoor lighting.

HVAC works included split and concealed air conditioning systems, in addition to galvanized ducting installation.

Industrial Standards
Quality Control
Fast Delivery
Project Scope

Civil Work

Complete structural, architectural and industrial civil works executed across the administrative and production areas.

01
70 Days

Admin Building Duration

Total execution duration for the administrative building.

02
25 Days

Structural Works

Structural construction works completed within 25 days.

03
45 Days

Finishing Works

Complete architectural finishing works delivered in 45 days.

04
1,400 m²

Admin Building

Three-floor administrative building.

05
28,000 m²

Production Workshop

Large-scale production and industrial workshop area.

06
9 Months

Project Duration

Total project execution period.

07
50,000 m²

Total Area

Overall area covered by the industrial project.

08
350+

Manpower

Skilled workforce involved throughout project execution.

Power & Infrastructure

Electrical Work

Complete power distribution, lighting and electrical infrastructure systems supporting the industrial facility.

Total Lighting System 1,100 Units
Outdoor Lighting 650 Units
Indoor Lighting 450 Units
01
6 MVA

Transformer Capacity

Three transformers with a combined capacity of 6 MVA.

02
90

Distribution Panels

Machine distribution panels installed across the facility.

03
5,000 M/L

Cable Trays

Complete industrial cable tray installation.

04
23,000 M/L

Electrical Cables

Power and control cables installed throughout the project.

05
2

Energy Rooms

Dedicated energy rooms supporting the facility.

06
2

Substations

Electrical substations for power distribution and control.

07
650

Outdoor Lighting Units

Outdoor lighting units covering roads and external areas.

08
450

Indoor Lighting Units

Indoor lighting units across administrative and production areas.

Climate Control

HVAC Work

Air conditioning and ventilation systems designed and installed for administrative and industrial spaces.

120

Air Conditioning Units

Split and concealed air conditioning units installed across the facility.

01
6 Tons

Galvanized Ducting

Fabrication and installation of galvanized HVAC ducting systems.

02
Media Company

Integrated Engineering. Delivered With Precision.

9 Months Project