Haier Industrial Park
2023/2024 B.
Civil Work
- OFFICE BULDING 2000M THREE FLOORS
- 200,000m Area
- MAN POWER > 500
- 9 months project
- 2000M/L FENCE
- 68,000 m work shop
- 40,000 roads
- 12,000 land scape
Electrical work
- MORE THAN 7500 ML CABLES TRAYS
- MORE THAN 25,000 LIGHTING UNIT
- MORE THAN 60,000 ML CABLES
- 10 MVA (4X TR.2.25MVA)
- 9 LIGHTNING ARRESTER
- 6 M.V.SMITH GEARS
- 10 earthing systems
- 240 L.V PANEL